
Installation and Usage Instructions:
1. The valve can be installed in any direction, with priority given to a horizontal position;
2. It is only suitable for full opening / full closing, and is not for throttling adjustment;
3. Threaded connection: Before installation, clean the pipeline to avoid damage to the seal by impurities.
E-mail: tonheflow@china-tonhe.com
Address:Building 3, Xinshun Sme Pioneer Park, Jiangkou Street, Huangyan District, Taizhou city, Zhejiang Province, China
whatsapp